VersionControl:PRs/magenta/420: Difference between revisions

From PickiPedia: A knowledge base of bluegrass, old time psychedelic jams, and other public domain music
Jump to navigationJump to search
DrivingThatTrain (talk | contribs)
cryptograss/magenta#420, as GitHub has it
 
DrivingThatTrain (talk | contribs)
cryptograss/magenta#420, as GitHub has it
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
|url=https://github.com/cryptograss/magenta/pull/420
|url=https://github.com/cryptograss/magenta/pull/420
|author=magent-cryptograss
|author=magent-cryptograss
|state=open
|state=merged
|base=main
|base=main
|branch=magent/ramp-view
|branch=magent/ramp-view
|opened=2026-11-07 07:57:52
|opened=2026-11-07 07:57:52
|pushed=2026-11-07 07:57:30
|pushed=2026-11-07 15:03:43
|merged=
|merged=2026-11-07 15:29:09
|closed=
|closed=
|worked_on_by=magent, justin, re
|worked_on_by=magent, justin, re
Line 16: Line 16:
|deploy=redeploy maybelle
|deploy=redeploy maybelle
}}
}}
<pre class="pr-body">The ramp view of [[Cryptograss:Moods/ramp/Plan]], section 2: a section under the chevron, beside todo. It's the UI Justin asked for ("Does githouse have a UI that I can see?"). It reads and writes nothing new.
**Open**, one row per piece of work:
- **Every open or draft pull request**, from its card on PickiPedia: title, who worked on it, the Moods, and the deploy note, all from the foot of its description.
- **Every branch pushed to githouse with no pull request yet**, marked "no PR yet". A mergeable is a branch.
- **Head, push time and size** (commits, +/−) come from githouse's copy, against the branch it targets. That's fresher than a card, which is looked at hourly. If githouse sees the head already in a deploy branch, the row says merged before the card catches up.
- **Last two mentions in any Mood**, linked. These are posts naming `repo#N`, a bare `#N` for magenta, the PR's URL, or its branch. Wakes quoting a post don't count.
- **🪢 asked** when an open merge ask names it.
- **Temperature dot** from the last push or mention: a day, three days, two weeks, or longer.
- **Sorting** by last activity, last push or last mention, in the page, with no reload.
**Merged lately**: the last five, with **live on**. That's the servers running a commit containing the PR's head: magenta's own commit on maybelle, and the maybelle-config commit each server's last deploy ran. Other repositories' deploys don't record what they ran yet (Plan, section 4), so their rows say "—" rather than guess.
**Names used**: `refs/merged/` and `refs/closed/` across the repos. **githouse's log**: the newest lines.
**Checked**
- Built against the live wiki and hunter's mirror: 22 open items across 5 repos, the 5 newest merged, and 3 names. 0.8 s uncached, then kept 60 s.
- Screenshots taken from a local render of exactly that.
- `test_ramp`: 8 tests on real bare repositories, covering naming patterns, cards with githouse, a githouse-only branch, merged-before-the-card, mentions (wakes excluded, two newest), asks, live-on, the page, and no githouse with no wiki.
- `test_section_nav` updated: every section's bar links pulls.
- Full suite: 1759 tests, OK.
Deploy: redeploy maybelle
Worked on by: magent, justin, re, in #ramp</pre>

Latest revision as of 16:06, 9 November 2026

magenta#420: The ramp, as a page: /moods/pulls/
State 🟣 merged 2026-11-07 15:29:09
Worked on by magent, justin, re
Moods #ramp
Deploy redeploy maybelle
Branch magent/ramp-view → main, by magent-cryptograss
Opened · last pushed 2026-11-07 07:57:52 · 2026-11-07 15:03:43
The ramp view of [[Cryptograss:Moods/ramp/Plan]], section 2: a section under the chevron, beside todo. It's the UI Justin asked for ("Does githouse have a UI that I can see?"). It reads and writes nothing new.

**Open**, one row per piece of work:
- **Every open or draft pull request**, from its card on PickiPedia: title, who worked on it, the Moods, and the deploy note, all from the foot of its description.
- **Every branch pushed to githouse with no pull request yet**, marked "no PR yet". A mergeable is a branch.
- **Head, push time and size** (commits, +/−) come from githouse's copy, against the branch it targets. That's fresher than a card, which is looked at hourly. If githouse sees the head already in a deploy branch, the row says merged before the card catches up.
- **Last two mentions in any Mood**, linked. These are posts naming `repo#N`, a bare `#N` for magenta, the PR's URL, or its branch. Wakes quoting a post don't count.
- **🪢 asked** when an open merge ask names it.
- **Temperature dot** from the last push or mention: a day, three days, two weeks, or longer.
- **Sorting** by last activity, last push or last mention, in the page, with no reload.

**Merged lately**: the last five, with **live on**. That's the servers running a commit containing the PR's head: magenta's own commit on maybelle, and the maybelle-config commit each server's last deploy ran. Other repositories' deploys don't record what they ran yet (Plan, section 4), so their rows say "—" rather than guess.

**Names used**: `refs/merged/` and `refs/closed/` across the repos. **githouse's log**: the newest lines.

**Checked**
- Built against the live wiki and hunter's mirror: 22 open items across 5 repos, the 5 newest merged, and 3 names. 0.8 s uncached, then kept 60 s.
- Screenshots taken from a local render of exactly that.
- `test_ramp`: 8 tests on real bare repositories, covering naming patterns, cards with githouse, a githouse-only branch, merged-before-the-card, mentions (wakes excluded, two newest), asks, live-on, the page, and no githouse with no wiki.
- `test_section_nav` updated: every section's bar links pulls.
- Full suite: 1759 tests, OK.

Deploy: redeploy maybelle
Worked on by: magent, justin, re, in #ramp