Cryptograss:Moods/ramp/todo

From PickiPedia: A knowledge base of bluegrass, old time psychedelic jams, and other public domain music
Revision as of 20:56, 5 November 2026 by Magent (talk | contribs) (ramp todo, 5 Nov: checked against GitHub, #ops and #emergence; Workspace verified; #250 conflicts; the plan page; dashboard and watches added (via update-page on MediaWiki MCP Server))
Jump to navigationJump to search
  • ☐
    Merge maybelle-config#246 (read-only GitHub token for memory-lane), then redeploy maybelle
    merge · justin
    Still open, mergeable (5 Nov). The webhook keeps PR cards fresh without it (magenta/402's card updated within minutes of its merge), but the ten-minute poll, to-do ticks, merge asks and status share 60 unsigned calls an hour and ran out on 31 Oct.
  • ☐
    Verify Cryptograss:Moods/ramp/Plan, the settled design in one place
    verify · justin
    Written by magent 5 Nov from the record. Read it as the plan; say what's wrong.
  • ☐
    Say go on githouse-on-maybelle, then magent reworks #250 (re's points 2, 4 and 5 as requirements)
    decision · justin
    #250 as opened puts it on hunter, and since 5 Nov it conflicts with production in three files (the Mood containers folding into /moods). Don't merge it; the rework supersedes it. Plan, section 3.
  • ☐
    Set each repo's GitHub default branch to the branch that deploys: production for maybelle-config, pickipedia, arthel; main for magenta. blue-railroad-import: pick one
    infra · justin
    5 Nov: all six still default to main (pickipedia-mcp master). Then delete magenta's production branch (a634f16, Nov 2025) and #376's per-repo check can go. Plan, section 5.
  • ☐
    Merge commits only (squash and rebase off), merge queue off, on every repo githouse copies
    infra · justin
    5 Nov: squash and rebase still allowed on maybelle-config, pickipedia, arthel, magenta, blue-railroad-import, pickipedia-mcp. githouse's merged-name detection needs merge commits.
  • ☐
    Rulesets on the branches that deploy (PR required, no force-push, no deletion; admins bypass)
    infra · justin
    5 Nov: none on any of the six. magent then tries a push to production that must fail, and reports. Private repos can't take rulesets on the free plan; githouse's hook covers those.
  • ☐
    Review magenta#333 (repo:branch autocomplete); merge after githouse is live
    review · re
    Reviewed by re 1 Nov, mergeable. Its branches.json URL moves with githouse to maybelle (re's point 7); magent updates it in the rework.
  • ☐
    Build the ramp view on magenta: open PRs across our repos, last five merged, who and where, last two mentions, sorted by last push or last mention, temperature
    code · magent
    Justin's memo, 30 Oct; the records half (cards) is live. After #246, so the view isn't starved of GitHub calls. Plan, section 2.
  • ☐
    Watches: merge and deploy asks resolved by commit ancestry against githouse's copy; deploys stamp the commit they deployed
    code · magent
    After githouse is live. Plan, section 4. Deploy stamping is the prerequisite nothing does yet.
  • ☐
    Decide how emergents do git: the patch route, own GitHub accounts, or githouse
    decision · justin
    githouse (above) is magent's and re's answer; this closes when it's live and re pushes a branch.
  • ☐
    Jenkins audit, re's open items: a policy on silent skips (pickipedia node/lua checks), pickipedia's chain-data warning that deploys stale silently, NVM/pnpm fetched from the network in every pipeline
    code · re
    From re's test map, 30 Oct. The mtime guard (#244) and the alarms (#402, #275) are done.